APMG-International AgilePM-Practitioner Exam Syllabus Topics:

TopicDetails
Topic 1
  • Lifecycle and Products: This section of the exam covers topics such as Agile project lifecycle, various stages of the lifecycle, agile products, Vision Documents, and Prototypes.
Topic 2
  • People and Roles: In this section, the topics covered include various roles involved in an Agile project and how they relate to each other. The topics covered include the responsibilities of the Agile Project Manager, agile teams, and business owners.
Topic 3
  • Techniques: In this section, the topics covered various techniques that can be utilized including iterative development. Candidates are tested for their know-how of agile techniques and timeboxing.
Topic 4
  • Planning and Control: In this section, the exam covers planning and control of the project and vital concepts such as estimation and iterative strategy. It also covers how to utilize MoSCoW prioritization and mitigate any risks.

 

NEW QUESTION # 34
To ensure that the UniCo change programme is successful, the Chief Executive Officer (CEO) knows that correctly assigning the key change roles will be essential.
Within Sales, which 2 people would be the BEST candidates to use as change agents, based on the descriptions given?

  • A. The Sales Administrator, who ensures that the sales processes run smoothly and works with all levels of Sales staff.
  • B. One of the existing members of the Sales staff, who is resistant to the change but is diligent and responsible in all tasks.
  • C. The Sales Director, who is keen to sell mobile applications to clients and manages the department.
  • D. One of the new members of the Sales staff, who has previous experience selling mobile applications.
  • E. One of the existing long-standing members of the Sales staff, who is good at getting things done across the organization.

Answer: D,E

Explanation:
Comprehensive and Detailed Step-by-Step Explanation
In this question, the change agent is someone within the Sales team who can facilitate and champion the change process. An ideal change agent should possess:
* Influence and credibility within the team.
* A positive attitude toward the change.
* Specific skills or experience relevant to the change initiative.
1. Why B (Long-Standing Staff Member) is Correct
* This individual has a proven track record of getting things done across the organization, suggesting they have credibility, influence, and relationships with other teams.
* Their long-standing experience makes them a trusted figure, capable of motivating their peers to engage with the change program.
2. Why D (New Member with Relevant Experience) is Correct
* This person brings previous experience in selling mobile applications, which aligns directly with the change initiative's goals of transitioning to mobile applications.
* Their background can help guide other team members, offering practical insights and building confidence in the new focus.
3. Analysis of Incorrect Options
* Option A (Sales Director):
* While the Sales Director has a strategic role in driving the change program, they are not the best fit for a change agent because they are likely focused on leadership and decision-making rather than day-to-day advocacy within the team.
* Change agents are typically positioned closer to their peers.
* Eliminate.
* Option C (Resistant Staff Member):
* Although diligent and responsible, resistance to the change indicates that this individual may not be the best advocate for the initiative.
* A change agent must actively support and promote the change, which may be difficult if they are resistant.
* Eliminate.
* Option E (Sales Administrator):
* The Sales Administrator plays a critical operational role in ensuring smooth processes but does not appear to have the influence or strategic insight necessary to serve as a change agent.
* Eliminate.
4. Practical Implications
* The selection of change agents like the long-standing staff member (B) ensures credibility and trust among peers.
* Including a new team member with relevant expertise (D) provides fresh perspectives and demonstrates that the organization values practical knowledge in driving the change forward.


NEW QUESTION # 35
Find out who is responsible for challenging the priority of requirements and deal with them accordingly.

  • A. Remove empowerment from the Solution Development Team.
  • B. Ask the Marketing Director to explain to the Solution Development Team why the windows are a Must Have priority.
  • C. Ask the Team Leader to resolve the situation.
  • D. What action should the Project Manager take when dealing with the Solution Development Team's argument that the windows should not be a Must Have priority?

Answer: C


NEW QUESTION # 36
When receiving instruction on practical skills, which approach is MOST valuable to the learner?

  • A. Practicing new skills until consistency is achieved.
  • B. Presentation of how the new skills relate to the organizational change.
  • C. Group discussion of how to learn the new skills.
  • D. Observing repeated demonstrations of the skill by the instructor.

Answer: A

Explanation:
Comprehensive and Detailed Explanation:
Practical skill acquisition focuses on hands-on practice to ensure learners achieve mastery and consistency.
This is central to Gagne's Nine Events of Instruction, which emphasize active learning strategies.
1. Relevance of Practice in Gagne's Model:
* Gagne's Event 6: Elicit Performance (Practice) highlights that learners must perform the skills themselves to solidify learning.
* Practical application is critical to achieving competence, especially for motor or procedural skills. It allows learners to identify gaps and refine their performance through repetition.
2. Why Option A is Correct:
* Practicing skills ensures that learners can consistently perform the task correctly. Repeated application:
* Reinforces memory.
* Builds muscle memory for physical tasks.
* Promotes confidence and accuracy.
* Consistency is the key indicator of mastery for practical skills.
3. Analysis of Other Options:
* Option B: Observing repeated demonstrations of the skill by the instructor.
* Observing demonstrations is useful for understanding, but it does not substitute for hands-on practice. Learners must engage actively to develop the skills themselves.
* Option C: Group discussion of how to learn the new skills.
* Discussion may help learners understand the steps or importance of the skill but does not directly contribute to skill mastery.
* Option D: Presentation of how the new skills relate to the organizational change.
* While this provides context, it does not help learners physically or cognitively practice the skill.
4. Practical Example:
* In a training session for operating new machinery, learners achieve the best outcomes by practicing with the equipment until they can operate it confidently and consistently.
5. Reference to Gagne's Model:
* Event 6: Elicit Performance (Practice) emphasizes the importance of active learner participation to reinforce learning and ensure skill mastery.


NEW QUESTION # 37
Answer the following questions about the use of the Agile principles.
Final checks carried out on the rooms delivered in Timebox A show that two of the items do NOT meet the required Must Have standards related to the use of traditional wall coverings and paints. These items have therefore been recognised as NOT delivered and will have to be re-planned.
Which Agile principle MOST influences this course of action?

  • A. Never compromise quality.
  • B. Collaborate.
  • C. Build incrementally from firm foundations.
  • D. Communicate continuously and clearly.

Answer: A


NEW QUESTION # 38
Answer the following questions about the acceptance criteria within the project.
Decide whether the approach to setting and using acceptance criteria has been applied appropriately and select the response that supports your decision.
During Solution Development Timebox A, a new Health and Safety requirement arises: the front door is required to have wheelchair access. This is a legal requirement and is a Must Have before any staff or general public access can be allowed. The Solution Development Team will work with the Local Planning Authority Officer, the specialist who identified the requirement, to identify further acceptance criteria for Solution Development Timebox A.
Is this an appropriate action related to acceptance criteria?

  • A. No, because this new requirement would NOT be included in the original Prioritised Requirements List and therefore does NOT need acceptance criteria to be defined.
  • B. Yes, because the Local Planning Authority Officer owns the justification for the new requirement.
  • C. No, because the Business Visionary is responsible for defining acceptance criteria.
  • D. Yes, because the new requirement needs to be understood, built and delivered in this Timebox.

Answer: D

Explanation:
A: Yes, because the new requirement needs to be understood, built and delivered in this Timebox.
Rationale:
Agile Project Management is adaptable to changes, even late in the development process. The introduction of a new Health and Safety requirement, such as wheelchair access, which is a legal and must-have requirement, needs to be incorporated into the project as soon as it is identified. Working with the Local Planning Authority Officer to define acceptance criteria ensures that the requirement is clearly understood and that the solution developed meets the necessary legal standards. This approach ensures that the team can immediately address the new requirement and integrate it into the current work cycle, aligning with Agile's principle of welcoming changing requirements, even late in development, for the customer's competitive advantage.
Topic 1, Hoy Hall Hotel Refurbishment Project
Scenario:
Hoy Hall Hotel Refurbishment Project
(Note:
Hoy Hall, a historic, timber-framed building dating from the 17th century, was originally the residence of the Lords of the Manor of Hoytown. The building is registered as a Heritage Building of Special Interest and is subject to restrictions in terms of development. Used as a hotel for over a century, it has recently fallen into disrepair, and for two years it has been completely unused, accelerating its deterioration. The local community has formed the Action Group "Hoy for Hoy Hall" to save the building, and wants to be closely involved in its future success.
After much discussion Hoy Hall has been purchased by Architecture Angels (AA), a small company whose directors are experienced hoteliers. Five years ago they decided to move into the property renovation business and have recently restored two other similarly-endangered buildings for use as hotels.
Architecture Angels are keen to both support local businesses and to have local people run their hotels, giving them a significant amount of autonomy to do this.
To maintain core consistency, the hotels use Architecture Angels' Head Office services, such as IT operations, accounting, payroll, stocktaking, compliance, human resources and property management. The Head Office is based 80 miles from Hoy Hall.
Recently Architecture Angels commenced an Agile project to renovate Hoy Hall, which has a large downstairs hall and reception area, and 20 potential bedrooms upstairs. The roof requires extensive repairs and the electrical and plumbing installations require complete replacement. The 40 acres of land around the site are overgrown and need to be restored, and the driveway needs re-laying.
In the hotel industry, the trend for direct customer bookings via the internet has had a major impact on the growth of those hotels with this facility. Online booking now accounts for around 80% of room bookings, with only 20% being made via walk-in and telephone enquiries. Before Hoy Hall can open for business, a reservation system must be fully operational.
Architecture Angels use contractors to manage such work and have good
relationships with two local companies: Timber Tigers (TT) who will handle the internal works, and Earth Excavations (EE) who will handle the gardens.
A Project Manager, who has since left the company, started the Feasibility phase. This phase has been continued by the Senior Management Team, which consists of the Sales, Marketing, and Finance Directors and the Chief Executive.
This was scheduled to take a month and has almost been completed. A
Feasibility Assessment has been produced. An Outline Business Case has been completed which assessed the project as being viable.
The Architecture Angels Senior Management Team will be responsible for
Steering the project.
The table below shows the appointments planned for the project team and is subject to change.

Additional Information:
The project is approaching the end of Feasibility. The original Project Manager was involved in drafting a Delivery Plan for the project but not in the outline refurbishment options.
The Senior Management Team generated several options for the refurbishment.
All the options included a landscaping solution for the gardens and re-laying of the driveway, as the solution will not be acceptable without these. However, the best solution for the refurbishment is still under debate. The new Project Manager has suggested that a Feasibility Prototype could consist of paper-based drawings for each option. The "Hoy for Hoy Hall" Action Group thinks that a physically-built representation is mandatory for a prototype and wants a small-scale model of the recommendation for the building. The time available to produce this, however, is limited.
Contracts for resources have not yet been signed and will be postponed until the chosen outline solution has been agreed.


NEW QUESTION # 39
Which 2 actions should the Team Leader take to implement the new Must
Have requirement?

  • A. Discuss the development interfaces and dependencies with the Solution Development Team to ensure the associated Timebox is appropriate.
  • B. Source and hire a web developer with experience in developing online financial transaction functionality.
  • C. Consolidate and circulate an agenda for the workshop.
  • D. Add the additional tasks required to create the financial transaction functionality to the Timebox Plan.
  • E. Agree to de-scope Should Have and/or Could Have requirements to allow for the new Must Have functionality.

Answer: A,D


NEW QUESTION # 40
Using the Project Scenario and the additional information provided for
this question in the Scenario Booklet, answer the following questions
about Feasibility.
Remember to limit your answers to the number of selections requested in each question.
Which 2 statements describe the appropriate application of Agile Project Management when developing the Delivery Plan?

  • A. The Project Manager should NOT need to identify any risks this early in the project.
  • B. The Earth Excavations' Head Gardener should be excluded from discussions related to deliverables since contracts are NOT yet signed.
  • C. The approach to the project should be based on the Project Approach Questionnaire responses.
  • D. The Project Manager should include any known constraints associated with planning permission.
  • E. The Architecture Angels' Marketing Director should be involved in the development of the Delivery Plan.

Answer: D,E

Explanation:
In the context of Agile Project Management, when developing the Delivery Plan during the Feasibility phase, the two statements that best align with Agile principles are:
A: The Project Manager should include any known constraints associated with planning permission.
E: The Architecture Angels' Marketing Director should be involved in the development of the Delivery Plan.
Here's the rationale:
*A: Recognizing and accounting for known constraints such as planning permission is a key aspect of Agile. It allows for better adaptability and planning around these constraints. Including them early in the Delivery Plan helps ensure that they are considered throughout the project.
*E: Agile emphasizes cross-functional collaboration and stakeholder engagement. The Marketing Director would provide valuable insights into customer needs and market conditions, which are crucial for a successful delivery plan.


NEW QUESTION # 41
The Change Manager is looking to develop the change agent network that will support the changes related to the Operational delivery processes workstream.
Which information is MOST likely to be relevant for the change agents when being inducted into the change programme for the Operational delivery processes workstream?

  • A. Expected new ways of working for UniCo technical delivery.
  • B. Staff contact details for the Operations department - UniCo and Selco.
  • C. Annual UniCo staff satisfaction survey results.
  • D. Portfolio, Programme, and Project Management Office Service Catalogue.

Answer: A

Explanation:
Comprehensive and Detailed Step-by-Step Explanation
When inducting change agents into a change programme, it is critical to provide them with the information that will directly support their role in facilitating the specific workstream. The Operational delivery processes workstream is focused on integrating technical systems and processes, making it essential for change agents to understand the new expectations and ways of working that will arise from this integration.
1. Why A (Expected New Ways of Working) is Correct
* Relevant to the Workstream: This information is directly related to the changes being implemented, such as process integration, operational alignment, and technical system modifications.
* Preparation of Change Agents: Change agents must understand the new ways of working to effectively communicate, advocate for, and facilitate the changes among their teams.
* Focus on Operational Changes: Since this workstream involves technical delivery processes, equipping change agents with relevant knowledge ensures they are aligned with the workstream's objectives.
2. Analysis of Incorrect Options
* Option B (Staff Contact Details):
* While useful for logistical purposes, this information is not directly linked to the change programme's objectives or the responsibilities of change agents in driving operational changes.
* Eliminate.
* Option C (Staff Satisfaction Survey Results):
* Staff satisfaction data is more relevant for monitoring cultural and engagement-related impacts rather than guiding operational delivery process changes.
* It does not provide actionable insights for the change agents in this specific workstream.
* Eliminate.
* Option D (Portfolio, Programme, and Project Management Office Service Catalogue):
* This information is related to overall project management frameworks and tools but does not offer specific guidance for the change agents tasked with facilitating operational delivery changes.
* Eliminate.
3. Practical Implications
* Equipping Change Agents: Providing detailed insights into expected new ways of working ensures that the change agents can address potential resistance, clarify expectations, and serve as knowledgeable advocates for the change.
* Alignment with Strategic Goals: By focusing on the technical delivery processes, the induction program helps ensure that change agents are aligned with UniCo's broader strategy of integrating Selco and delivering innovative solutions.


NEW QUESTION # 42
Using the project timeline given in the Project Scenario, answer the following question about application of Timeboxing on the Hoy Hall project.
Lines 1 to 5 in the table below consist of an assertion statement and a reason statement. For each line identify the appropriate option, from options A to E, that applies.
Each option can be used once, more than once or not at all.

Assertion :
1. All internal works to be assigned to Timber Tigers throughout the project should be consolidated into one Structured Timebox.
BECAUSE
The Investigation step within each Structured Timebox requires everyone working within the team to jointly agree how the requirements of the Timebox will be met.
2. Acceptance criteria for the front rooms to be developed in Timebox A should be described in detail and agreed during the Timebox Kick-Off BECAUSE The aim of the Investigation step within each Timebox is to complete as much of the development work as possible.
3. It is appropriate that both the Evolutionary Development phase and Deployment phase are shown in the first Project Increment.
BECAUSE
Each Timebox should comprise an Evolutionary Development phase and
Deployment phase.
4. It is appropriate that the outputs of Timebox C are scheduled for deployment at the end of the first Project Increment.
BECAUSE
A typical Timebox Plan should provide a schedule of high-level activities for the imminent Project Increment.
5. It is appropriate that Earth Excavations create a detailed plan of activities they will complete during Timebox C.
Reason
BECAUSE
The Solution Development Team is responsible for planning the detail of all the work of each Timebox.

Answer:

Explanation:

Explanation:
For each line, here is the appropriate option from A to E that applies:
* All internal works to be assigned to Timber Tigers throughout the project should be consolidated into one Structured Timebox.
* E. False (Assertion) False (Reason)
* Rationale: It is not practical or in line with Agile principles to consolidate all internal works into one Structured Timebox, as the work will likely need to be spread over multiple Timeboxes.
Additionally, the Investigation step involves agreeing on how to meet the requirements of the Timebox, not necessarily consolidating all work into one.
* Acceptance criteria for the front rooms to be developed in Timebox A should be described in detail and agreed during the Timebox Kick-Off
* B. True (Assertion) True (Reason) BUT the reason does not explain the assertion
* Rationale: While it is true that acceptance criteria should be agreed upon during the Timebox Kick-Off, the reason given is incorrect because the aim of the Investigation step is not necessarily to complete as much development work as possible but to plan and understand the work that will be carried out.
* It is appropriate that both the Evolutionary Development phase and Deployment phase are shown in the first Project Increment.
* A. True (Assertion) True (Reason) AND the reason explains the assertion
* Rationale: Each Timebox should indeed include both Evolutionary Development and a Deployment phase. This assertion and reason correctly align with the concept of Timeboxing in Agile.
* It is appropriate that the outputs of Timebox C are scheduled for deployment at the end of the first Project Increment.
* A. True (Assertion) True (Reason) AND the reason explains the assertion
* Rationale: The typical Timebox Plan does provide a schedule of high-level activities for the imminent Project Increment, which would include planning for deployment.
* It is appropriate that Earth Excavations create a detailed plan of activities they will complete during Timebox C.
* C. True (Assertion) False (Reason)
* Rationale: While it is true that Earth Excavations should create a detailed plan for their activities in Timebox C, the reason is incorrect as the Solution Development Team is not solely responsible for planning all work details within a Timebox. This task would typically be a collaborative effort involving all relevant parties.


NEW QUESTION # 43
Which 2 statements represent appropriate entries for the Development
Approach Definition?

  • A. The Sales Manager will introduce an awards or bonus scheme, designed to create competition between the sales assistants.
  • B. Once deployed, the number of policies sold through traditional telephone sales will be compared with the number of sales processed online through the website.
  • C. Accessibility and performance of the new online quotation area is to be tested using a tool called Sitebeam.
  • D. The Finance Director has requested a detailed report be produced after 12 weeks, showing costs to date and forecast cost to complete.
  • E. An easy to use web development tool called 'WebMatrix' is to be used to develop and maintain the website extension.

Answer: C,E

Explanation:
For the XAN Insurance Company Web Project, the Development Approach Definition document should outline the methodologies, tools, and techniques to be used during the development process of the project. It focuses on how the project will be executed in terms of technical and management practices.
Selected Statements for the Development Approach Definition:
C: An easy to use web development tool called 'WebMatrix' is to be used to develop and maintain the website extension.
E: Accessibility and performance of the new online quotation area is to be tested using a tool called Sitebeam.
C: This statement directly specifies a tool (WebMatrix) that will be used for web development and maintenance in the project. It is a clear choice regarding the technical approach and infrastructure, making it suitable for inclusion in the Development Approach Definition.
E: Mentioning Sitebeam as a tool for testing accessibility and performance outlines specific methods for ensuring quality and usability in the development process. It provides actionable information on how testing will be conducted, fitting the criteria for the Development Approach Definition.
Why Other Statements Are Excluded:
A: Introducing an awards or bonus scheme to create competition among sales assistants pertains more to internal sales team management and motivation strategies rather than the technical or methodological approach to developing the project.
B: Comparing traditional telephone sales with online sales is related to the project's performance measurement and post-implementation review, not the development approach or methodology used during the project.
D; The request from the Finance Director for a detailed cost report is related to project financial management and monitoring. While important, it does not detail the technical or methodological approach to developing the project's deliverables.


NEW QUESTION # 44
The Timebox to deliver the online reservation system through the Hoy Hall website has experienced a major issue. During Timebox C a test was completed to simulate an attack on the financial element of the online reservation system, with the intention of finding security weaknesses. It was found that it was potentially possible to gain access to the system, its functionality and data. Further work is therefore needed to meet the information security elements of a customer financial transaction.
Answer the following question about the actions to be taken by each role.
Column 1 describes a list of actions related to dealing with the security issue with the hotel reservation system. Column 2 lists the key roles. For each action in Column 1, select from Column 2 the role that should carry out the action.
Each selection from Column 2 can be used once, more than once or not at all.
Column 1
* Advise how the legislation on the transfer of data will affect the requirements and the system.
* Agree the changes needed to the corporate technical architecture with the Architecture Angels IT support team.
* Ensure the information security vulnerability is communicated to the AA Head Office IT Director.
* Evaluate the impact of proposed security controls on the business and decide on the most suitable solution.
* Reprioritise the requirements on the Prioritised Requirements List associated with the security issue.
Column 2
* Project Manager
* Business Sponsor
* Business Visionary
* Technical Coordinator
* Business Analyst
* Team Leader
* Business Ambassador
* Solution Developer

Answer:

Explanation:

Explanation:
* Advise how the legislation on the transfer of data will affect the requirements and the system.
* E. Business Analyst
* Agree the changes needed to the corporate technical architecture with the Architecture Angels IT support team.
* D. Technical Coordinator
* Ensure the information security vulnerability is communicated to the AA Head Office IT Director.
* A. Project Manager
* Evaluate the impact of proposed security controls on the business and decide on the most suitable solution.
* B. Business Sponsor
* Reprioritise the requirements on the Prioritised Requirements List associated with the security issue.
* C. Business Visionary
Rationale:
* A Business Analyst typically has the expertise to understand and communicate how data transfer legislation impacts system requirements.
* The Technical Coordinator is usually responsible for technical decisions, including those that impact the technical architecture, and would work closely with the IT support team to agree on changes.
* The Project Manager should ensure that key information, such as security vulnerabilities, is communicated to senior management, in this case, the IT Director.
* The Business Sponsor, who is ultimately responsible for the project from a business perspective, would evaluate the impact of security measures on the business.
* The Business Visionary is often tasked with understanding the strategic view of the project requirements and would be suited to reprioritize requirements, especially those with significant implications like security issues.


NEW QUESTION # 45
The Change Manager has mapped stakeholders onto a Power-Interest
Matrix, with the aim of identifying suitable actions for managing these stakeholders.
The mapping below shows the current assessment made by the Change Manager.
The 'Interest in your change' axis indicates a combination of the
stakeholders' levels of active engagement and their buy-in for the Change Programme.

Using the Scenario and the additional information provided for this question in the Scenario Booklet, answer the following question about Stakeholder mapping and strategy.
Lines 1 to 4 in the table below consist of an assertion statement and a reason statement. For each line identify the appropriate option, from options A to E, that applies. Each option can be used once, more than once or not at all.


Answer:

Explanation:

Explanation:
Comprehensive and Detailed Step by Step Explanation:
1. Assertion: The Change Manager should aim to engage and move the Customer Services Director to the Active Players quadrant.
Reason: Acknowledging a stakeholder's influence is an important step in developing greater understanding of how to manage them.
* Analysis:The Customer Services Director currently holds significant influence but is not fully engaged with the change. Moving them to the "Active Players" quadrant aligns with stakeholder management principles because Active Players have both high influence and high interest. The reason provided supports this by emphasizing understanding and managing stakeholders' influence.
* Conclusion:Both the assertion and reason are correct, but the reason does not directly explain why moving the stakeholder to "Active Players" is the action.Answer: B (True, True BUT the reason does not explain the assertion).
2. Assertion: The Change Manager should plan to increase the Operations Director's level of interest in the change.
Reason: Influential Observers need to become Key Players if they need to be engaged actively in the change.
* Analysis:The Operations Director is an influential observer with high influence but low interest.
Increasing their interest ensures their alignment with the program goals, making them Key Players. The reason provided directly explains why this move is necessary.
* Conclusion:Both the assertion and reason are correct, and the reason directly explains the assertion.
answer: A (True, True AND the reason explains the assertion).
3. Assertion: It is appropriate to manage the involvement of Selco staff by regularly sending them progress updates.
Reason: Spectators only require regular information updates to maintain their interest in the change.
* Analysis:Selco staff are categorized as "Spectators," indicating they have low influence and interest.
Regular updates are sufficient to keep them informed without unnecessary engagement. The reason aligns with stakeholder management strategies for Spectators.
* Conclusion:Both the assertion and reason are correct, and the reason directly supports the assertion.
answer: A (True, True AND the reason explains the assertion).
4. Assertion: The Human Resources Manager needs to be managed and moved to the Key Players quadrant.
Reason: People with specialist skillsets should be categorized with a high level of influence and power in any change.
* Analysis:The Human Resources Manager currently resides in the "Active Players" quadrant. While they contribute specialist skills, this does not necessarily justify elevating them to "Key Players," who must also possess significant influence. The reason, while true, does not align with the change scenario.
* Conclusion:The assertion is false, but the reason is true.Answer: D (False, True).


NEW QUESTION # 46
Which 2 actions demonstrate connectivity?

  • A. Ask the senior leadership to provide examples of other companies undertaking, and successfully overcoming, similar challenges.
  • B. Send the plans of the new office layout to the Selco staff showing them where each individual will be located.
  • C. Make short videos available showing how customer service teams from other companies effectively provide services for these types of offerings.
  • D. Create a central area on the UniCo internal shared work system for the Change Programme to collaborate and comment on the materials.
  • E. Arrange a number of briefing sessions for Customer Services staff, over lunch times and in a comfortable setting.

Answer: D,E

Explanation:
Comprehensive and Detailed Step-by-Step Explanation
Understanding Connectivity in Change Management
Connectivity refers to fostering a sense of shared purpose, collaboration, and strong communication between all stakeholders. Actions demonstrating connectivity help stakeholders feel linked to the broader change initiative, ensuring smooth transitions and alignment of efforts.
Option Analysis
* A. Arrange a number of briefing sessions for Customer Services staff, over lunch times and in a comfortable setting
* This action directly supports connectivity by fostering open discussions, improving communication, and ensuring that staff have a platform to interact and share ideas in a comfortable environment.
* Correct.
* B. Make short videos available showing how customer service teams from other companies effectively provide services for these types of offerings
* While informative, this action focuses more on education and benchmarking than on fostering connections or interaction between team members.
* Incorrect.
* C. Create a central area on the UniCo internal shared work system for the Change Programme to collaborate and comment on the materials
* This promotes connectivity by creating a space where staff can interact, share feedback, and collaborate on the change initiative. A shared workspace enhances team alignment and communication.
* Correct.
* D. Ask the senior leadership to provide examples of other companies undertaking, and successfully overcoming, similar challenges
* This action primarily addresses leadership engagement and inspiration rather than connectivity among team members. It does not involve active collaboration or interaction.
* Incorrect.
* E. Send the plans of the new office layout to the Selco staff showing them where each individual will be located
* While this action communicates logistical details, it does not create opportunities for connection or collaboration between stakeholders.
* Incorrect.
Why A and C are the Correct Answers (Scenario Alignment)
Both actions emphasize interaction and collaboration among stakeholders:
* A: Encourages personal interaction in an informal setting, promoting open dialogue and better connections.
* C: Provides a digital platform for collaboration, ensuring all stakeholders remain connected and informed.
References (AgilePM and Scenario Alignment):
* AgilePM Handbook, Chapter 6: Collaboration and Communication in Change Management.
* UniCo Scenario: "Staff need to work collaboratively to develop the new attitudes and capabilities required to succeed in the mobile applications market."
* Agile Business Consortium - Creating Collaborative Workspaces for Change.


NEW QUESTION # 47
Resources are limited. The Sales Manager has two marketing assistants who may be able to give a few hours a week between them to the project.
What action should the Project Manager take?

  • A. Make each Timebox as long as possible to ensure the marketing
    assistants have enough time to complete any work allocated to them
    within the boundaries of the Timebox.
  • B. Accept that members of the Solution Development Team will be
    inconsistent.
  • C. Try to secure formal agreement as to how many hours per week the
    marketing assistants will spend on the project.
  • D. Schedule the two marketing assistants to work at different times so they can hand matters over to one another.

Answer: C

Explanation:
In the context of Agile Project Management, it is crucial to have clear commitments regarding team members' availability to ensure that project planning and execution can be as accurate and effective as possible. By securing a formal agreement on the hours the marketing assistants can dedicate to the project each week, the Project Manager can better plan tasks and allocate resources, thereby optimizing the team's capacity and ensuring that project timelines and deliverables are realistic and achievable.
References:
The Agile Project Management (AgilePM) framework emphasizes the importance of clear communication, resource planning, and commitment from all team members to ensure project success. Having a formal agreement on availability helps in setting clear expectations and allows for more effective planning and utilization of resources within the constraints of the project, aligning with Agile principles of collaboration, adaptability, and iterative progress.


NEW QUESTION # 48
Answer the following questions about the acceptance criteria within the project.
Decide whether the approach to setting and using acceptance criteria has been applied appropriately and select the response that supports your decision.
During Solution Development Timebox A, a new Health and Safety requirement arises: the front door is required to have wheelchair access. This is a legal requirement and is a Must Have before any staff or general public access can be allowed. The Solution Development Team will work with the Local Planning Authority Officer, the specialist who identified the requirement, to identify further acceptance criteria for Solution Development Timebox A.
Is this an appropriate action related to acceptance criteria?

  • A. No, because this new requirement would NOT be included in the original Prioritised Requirements List and therefore does NOT need acceptance criteria to be defined.
  • B. Yes, because the Local Planning Authority Officer owns the justification for the new requirement.
  • C. No, because the Business Visionary is responsible for defining acceptance criteria.
  • D. Yes, because the new requirement needs to be understood, built and delivered in this Timebox.

Answer: D

Explanation:
A: Yes, because the new requirement needs to be understood, built and delivered in this Timebox.
Rationale:
Agile Project Management is adaptable to changes, even late in the development process. The introduction of a new Health and Safety requirement, such as wheelchair access, which is a legal and must-have requirement, needs to be incorporated into the project as soon as it is identified. Working with the Local Planning Authority Officer to define acceptance criteria ensures that the requirement is clearly understood and that the solution developed meets the necessary legal standards. This approach ensures that the team can immediately address the new requirement and integrate it into the current work cycle, aligning with Agile's principle of welcoming changing requirements, even late in development, for the customer's competitive advantage.


NEW QUESTION # 49
......