
Certification Topics of C_P2W43_2023 Exam PDF Recently Updated Questions
C_P2W43_2023 Exam Prep Guide: Prep guide for the C_P2W43_2023 Exam
NEW QUESTION # 37
What do you have to consider when implementing Ul technologies in SAP S/4HANA Asset Management? Note: There are 2 correct answers to this question
- A. The cloud version can also use SAP GUI for Windows.
- B. SAP Fiori Launchpad supports only SAPUIS apps.
- C. SAP GUI for HTML can be used in the SAP Fiori Launchpad.
- D. Web Dynpro apps can be used in the SAP Fiori Launchpad.
Answer: C,D
NEW QUESTION # 38
Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question
- A. Maintain settings at plant level for usage decisions.
- B. Assign an Inspection Type to a Maintenance Order Type.
- C. Assign an Inspection Type to a Maintenance Order Type and a Planning Plant
- D. Create a control key which expects inspection characteristic assignments
Answer: A,B
NEW QUESTION # 39
Which objects can you assign to a Maintenance Service Order Item? Note: There are 2 correct answers to this question.
- A. Service Work Center
- B. Service Product
- C. DIP Profile
- D. Service Master Record
Answer: B,C
NEW QUESTION # 40
You require stock material to carry out maintenance tasks. What do you have to consider regarding material planning in the maintenance order? Note: There are 2 correct answers to this question?
- A. A goods issue can be entered for planned and unplanned material
- B. Material can be assigned at the order header level.
- C. The pick list for materials can be printed before order release.
- D. For stock material you always need a reservation
Answer: A,D
NEW QUESTION # 41
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.
- A. Scheduling period
- B. Factory calendar
- C. Start date
- D. Scheduling indicator
Answer: A,C
NEW QUESTION # 42
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note: There are 2 correct answers to this question
- A. The order moves to the Preparation phase once it is approved and released
- B. The configuration of the order type decides whether you use Resource Scheduling or not.
- C. If you use the Resource Scheduling apps, you always dispatch orders and operations.
- D. Maintenance Planning Buckets give you a list of non-approved notifications
Answer: A,C
NEW QUESTION # 43
Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question
- A. Generate Inspection Lots assigned to maintenance order headers.
- B. Link PM task list with assigned inspection point type to a maintenance item.
- C. Generate Inspection Lols within the checklists view.
- D. Record the usage decision for an Inspection Lot
Answer: A,D
NEW QUESTION # 44
Which options do you have in SAP S/4HANA Asset Management, Public Cloud Edition? Note: There are 2 correct answers to this question
- A. You have access to the SAP S/4HANA back-end system
- B. You do NOT have access to the SAP S/4HANA back-end system.
- C. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
- D. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network
Answer: B,C
NEW QUESTION # 45
A Task List contains two operations: Every 3 MON: pump inspection Every 24 MON. pump replacement When replacing the pump, the operation pump inspection will be ignored. How can you achieve this?
- A. Create a task list hierarchy
- B. Create a cycle set sequence
- C. Set the lead float
- D. Assign different hierarchy levels
Answer: D
NEW QUESTION # 46
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question
- A. Create a task list for functional location
- B. Change a reference location.
- C. Edit classification data and characteristics.
- D. Assign documents
- E. Assign a subordinate piece of equipment.
Answer: B,C,D
NEW QUESTION # 47
What happens if you change the primary key of a functional location?
- A. The user must decide whether the functional location is assigned to a new superior functional location.
- B. The functional location cannot be assigned to a new superior functional location when the new label is entered.
- C. Changing the superior functional location via alternative labeling is not possible.
- D. The user must define a new labelling system for the new primary key.
Answer: B
NEW QUESTION # 48
How do you set up the visible tiles for a specific user in SAP Fiori Launchpad? Note: There are 2 correct answers to this question
- A. By assigning a PFCG role with an SAP Fiori tile group
- B. By assigning the tiles directly
- C. By assigning a PFCG role with an SAP Fiori catalog
- D. By assigning a portal role with an SAP Fiori catalog
Answer: A,C
NEW QUESTION # 49
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to this question
- A. Complete Close Report
- B. Schedule Dispatch
- C. Release Start Work
- D. Release Print
Answer: A,C
NEW QUESTION # 50
You are analyzing the data transfer of the cost center of a piece of equipment. What are the possible data origins? Note: There are 2 correct answers to this question
- A. The cost center of the superior equipment
- B. The reference functional location of the superior functional location
- C. The cost center of the related maintenance work center
- D. The individual maintenance of the cost center in the equipment master record
Answer: A,D
NEW QUESTION # 51
What is a characteristic of the SAP Fiori tile group? Note: There are 2 correct answers to this question?
- A. It is assigned via a portal role.
- B. It provides only HTML5-based apps
- C. It is based on an SAP Fiori tile catalog.
- D. It can be assigned directly to the user via personalization
Answer: C,D
NEW QUESTION # 52
The planner adds non-stock material in a released maintenance order. What are possible options within the maintenance order? Note: There are 3 correct answers to this question?
- A. A goods receipt can be posted after the maintenance order is technically completed.
- B. The maintenance order can be set to TECO before the invoice is created
- C. A purchase requisition can be created automatically as soon as the order is saved.
- D. A purchase order is created automatically as soon as the order is saved.
- E. A purchase requisition will ALWAYS be created as soon as the order is saved.
Answer: B,C,E
NEW QUESTION # 53
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.
- A. Completion data
- B. Maintenance activity type
- C. Call object
- D. Change documents
- E. Order type
Answer: A,C,D
NEW QUESTION # 54
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?
- A. Planned date of the next call, independent of maintenance order dates
- B. Actual finish date of the maintenance order
- C. The date of the final confirmation
- D. Technical completion date of the maintenance order
Answer: D
NEW QUESTION # 55
To which objects can a personnel number be directly assigned? Note: There are 2 correct answers to this question?
- A. Maintenance plan
- B. Business partner
- C. Planner group
- D. Work center
Answer: B,D
NEW QUESTION # 56
In which maintenance object can you use an activity type? Note: There are 2 correct answers to this question.
- A. Maintenance order operation
- B. Maintenance order header
- C. Notification activity
- D. Work center
Answer: A,D
NEW QUESTION # 57
......
2026 New Preparation Guide of SAP C_P2W43_2023 Exam: https://www.examprepaway.com/SAP/braindumps.C_P2W43_2023.ete.file.html
C_P2W43_2023 Practice Exam - 82 Unique Questions: https://drive.google.com/open?id=1di9A2HqS7gjsG_gQgq9APQBVCHDHSdoA