[Jan 29, 2022] C-TS422-1909 PDF Questions and Testing Engine With 91 Questions [Q51-Q74]

Share

[Jan 29, 2022] C-TS422-1909 PDF Questions and Testing Engine With 91 Questions

Updated Exam Engine for C-TS422-1909 Exam Free Demo & 365 Day Updates


C-TS422-1909 Exam Certification Details:

Level:Associate
Exam:80 questions
Cut Score:55%
Languages:German, English, French, Chinese
Duration:180 mins
Sample Questions: SAP C-TS422-1909 Exam Sample Question

 

NEW QUESTION 51
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?

  • A. Supply Network Planning (SNP)
  • B. Capacity Requirements Planning (CRP)
  • C. Material Requirements Planning (MRP)
  • D. Demand Planning (DP)

Answer: C

 

NEW QUESTION 52
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.

  • A. Checking control must have an overall profile assigned in customizing.
  • B. Checking rule and group must be assigned.
  • C. Indicator Relevant for finite scheduling must be set.
  • D. PRT Availability check must be set.

Answer: A,C

 

NEW QUESTION 53
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work center capacities chart
  • B. Order (pool) chart
  • C. Orders (dispatched) chart
  • D. Capacity requirements chart

Answer: A,D

 

NEW QUESTION 54
Which of the following apply to MRP Live?
There are 2 correct answers to this question.
Response:

  • A. The definition of the planning scope is more flexible.
  • B. Planned orders need to be converted to purchase requisitions for externally procured materials.
  • C. The BAdIs for classical MRP also apply to MRP Live.
  • D. The sequence of planning materials is calculated across plants.

Answer: A,D

 

NEW QUESTION 55
In which customizing activity do you set up automatic routing selection for production orders?
Please choose the correct answer.
Response:

  • A. Define order-type-dependent parameter
  • B. Define production scheduling profile
  • C. Define selection profiles
  • D. Define scheduling parameters for production orders

Answer: A

 

NEW QUESTION 56
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Forecast planning
  • B. Consumption-based planning
  • C. Material requirements planning
  • D. Manual planning without check

Answer: B

 

NEW QUESTION 57
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.
Response:

  • A. They can be applied to make-to-stock production order.
  • B. They can be used for manufacturing with collective orders.
  • C. They can be used for repetitive manufacturing.
  • D. They can be created automatically during month end process.

Answer: A,C

 

NEW QUESTION 58
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. By material type
  • B. By period
  • C. By industry
  • D. By plant

Answer: B,D

 

NEW QUESTION 59
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

  • A. Create object selection variant for product-related alerts.
  • B. Create object selection variant for transportation lane-related alerts.
  • C. Assign the overall profile to the authorization profile.
  • D. Create object selection variant for resource-related alerts
  • E. Assign the alert profile to the overall profile.

Answer: A,D,E

 

NEW QUESTION 60
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Parallel processing across servers
  • B. MRP list
  • C. Planning horizon
  • D. Net change planning

Answer: D

 

NEW QUESTION 61
On which of the following levels can you influence the availability check for the components of production orders?
There are 2 correct answers to this question.
Response:

  • A. Production order type
  • B. Material master
  • C. Production controller
  • D. MRP controller

Answer: B,D

 

NEW QUESTION 62
What capabilities does SAP S/4HANA embedded analytics provide?
There are 2 correct answers to this question.
Response:

  • A. Strategic analysis
  • B. Real time decision support
  • C. Comparison of current data with historical data to identify trends
  • D. Automatic update of story boards

Answer: A,B

 

NEW QUESTION 63
What are attributes of the SAP S/4HANA Simplification list?
There are 3 correct answers to this question.
Response:

  • A. It is only a grouping of related technical simplifications
  • B. It was created for better planning and estimation of your way to S/4HANA
  • C. It can have a business and a technical impact
  • D. It details transaction and solution capabilities at a functional level
  • E. It contains references to the relevant training material

Answer: B,C,D

 

NEW QUESTION 64
What is the purpose of collective orders?

  • A. To post any component withdrawals single back flush with order confirmation
  • B. To manage production orders for an entire finished product on multiple levels
  • C. To combine order management of co-products and by-products with the main product
  • D. To post production costs on a cost collector instead of the production order

Answer: B

 

NEW QUESTION 65
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements only if the work center has sufficient capacity.
  • B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • D. MRP creates capacity requirements without checking the capacity of a work center.

Answer: D

 

NEW QUESTION 66
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.
Response:

  • A. Fixed lot sizing
  • B. Periodic lot sizing
  • C. Exact lot sizing
  • D. Minimum lot sizing

Answer: B

 

NEW QUESTION 67
Which process order function uses a resource network?
Please choose the correct answer.
Response:

  • A. Resource selection
  • B. Capacity leveling
  • C. Capacity planning
  • D. Resource scheduling

Answer: A

 

NEW QUESTION 68
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Work center hierarchy
  • B. Resource network
  • C. Operation network
  • D. Setup matrix

Answer: A

 

NEW QUESTION 69
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

  • A. The work center has several individual capacities.
  • B. The Change Planning Direct on indicator is set.
  • C. Alternative resources are fully occupied.
  • D. The planning strategy is infinite.

Answer: A,D

 

NEW QUESTION 70
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Material staging for next order in sequence
  • B. Posting of goods receipt for the product
  • C. Posting of production costs to the production cost collector
  • D. Archiving of documents for assembly scrap
  • E. Reduction of associated capacity requirements

Answer: B,C,E

 

NEW QUESTION 71
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning?
There are 2 correct answers to this question.
Response:

  • A. Work center
  • B. Material master
  • C. Contract
  • D. Production plant

Answer: C,D

 

NEW QUESTION 72
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan?
There are 3 correct answers to this question.
Response:

  • A. Use multilevel MRP run for the products on the resource
  • B. Use DS heuristic "Schedule Sequence"
  • C. Use a bucket-oriented capacity check
  • D. Use rescheduling with an alternative mode
  • E. Use optimization with respect to set-up times

Answer: B,D,E

 

NEW QUESTION 73
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.

  • A. Planning mode (bucket/sequence)
  • B. Direction (forward/backward)
  • C. Fixed pegging (on/off)
  • D. Finiteness level (0...1)
  • E. Scheduling control (finite/infinite)

Answer: A,B,E

 

NEW QUESTION 74
......

Exam Passing Guarantee C-TS422-1909 Exam with Accurate Quastions: https://www.examprepaway.com/SAP/braindumps.C-TS422-1909.ete.file.html