SAP C_S4EWM_2020 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Create customizing settings and use Process and Layout-Oriented Storage Control
  • System Integration, Master Data and Delivery Document Customizing
Topic 2
  • Combine outbound deliveries using wave management
  • Define the warehouse structure and set up resource management
Topic 3
  • Cross Topics (Labor Management, Exception Handling, Batches, Serial Numbers)
  • Warehouse Process Types, Warehouse Task Creation, Strategies
Topic 4
  • Monitor warehouse activities using Warehouse Management Monitor
  • Set up system integration; Distribute master data and customize delivery documents
Topic 5
  • Define Warehouse process types and set up determination. Define Putaway and Picking Strategies
  • Outbound Processes (Wave Management, Cross-docking, Production Integration)


C_S4EWM_2020 Exam Certification Details:

Duration:180 mins
Level:Associate
Sample Questions: SAP C_S4EWM_2020 Exam Sample Question
Cut Score:63%
Languages:German, English, Japanese

 

NEW QUESTION 21
You have maintained several process types that should all use the same storage type search sequence for putaway. You want to minimize customizing efforts and create only one entry for these process types. What can you use to achieve this goal?

  • A. Storage process
  • B. Putaway control indicator
  • C. Process type group
  • D. Activity assigned to process type

Answer: C

 

NEW QUESTION 22
At which level do you configure two-step picking?

  • A. Storage section
  • B. Activity area
  • C. Warehouse number
  • D. Storage type

Answer: C

 

NEW QUESTION 23
What can you do with a storage group? Note: There are 2 correct answers to this question.

  • A. Use it in process-oriented and layout-oriented storage control.
  • B. Assign it as an intermediate storage group.
  • C. Assign it to multiple storage bins.
  • D. Use it to define a logical or physical breakdown of a storage type.

Answer: A,C

 

NEW QUESTION 24
Your customer needs a new warehouse order creation rule. Which criteria can you use to create a filter at item level? Note: There are 3 correct answers to this question.

  • A. Volume
  • B. Number of handling units
  • C. Number of items
  • D. Time
  • E. Weight

Answer: A,D,E

 

NEW QUESTION 25
What are the key fields used to define a delivery document in SAP Extended Warehouse Management customizing? Note: There are 2 correct answers to this question.

  • A. System profile
  • B. Warehouse number
  • C. Document type
  • D. Document category

Answer: B,D

 

NEW QUESTION 26
Which objects in the SAP Extended Warehouse Management (SAP EWM) application are used to map an SAP ERP warehouse to an SAP EWM warehouse? Note: There are 2 correct answers to this question.

  • A. Storage location
  • B. Business system
  • C. Plant
  • D. Warehouse number

Answer: B,D

 

NEW QUESTION 27
Your customer wants to implement the material flow system (MFS) to control conveyors and the automated high rack storage area. How do you connect SAP Extended Warehouse Management to communicate with the programmable logic controllers (PLC)? Note: There are 2 correct answers to this question.

  • A. Send an IDoc through a Post Processing Framework action to the PLC.
  • B. Use an RFC adapter to connect with the TCP/IP socket server of the PLC.
  • C. Directly integrate to the PLC using ABAP Push Channels.
  • D. Activate the link to the subsystems using the ALE interface on the warehouse number.

Answer: B,D

 

NEW QUESTION 28
How are warehouse orders sorted for automatic assignment to a resource? Note: There are 2 correct answers to this question.

  • A. By mode
  • B. By activity area sorting
  • C. By execution priority
  • D. By latest starting date

Answer: B,C

 

NEW QUESTION 29
Which stocks can be displayed in the SAP Extended Warehouse Management warehouse management monitor? Note: There are 2 correct answers to this question.

  • A. Stock on resources
  • B. Stock in transit
  • C. Stock in transportation units
  • D. Stock at third party

Answer: A,C

 

NEW QUESTION 30
How can you determine the labor activities to calculate the planned duration for activities in the warehouse? Note: There are 2 correct answers to this question.

  • A. Directly
  • B. As a standard step
  • C. Using a decision service in BRFplus
  • D. Using a work step sequence

Answer: A,C

 

NEW QUESTION 31
Which of the following are product warehouse tasks during putaway with process-oriented storage control?

  • A. The first process step
  • B. All process steps
  • C. The first and final process step
  • D. The final process step

Answer: A

 

NEW QUESTION 32
What is the specific characteristic of the early capacity check?

  • A. It is only done during the actual picking process.
  • B. It is only available when working with mobile devices.
  • C. It only happens during the warehouse task creation.
  • D. It is based on capacities of bin types.

Answer: C

 

NEW QUESTION 33
Which stock removal strategy can be realized with either packaging specifications or the alternative unit of measure (AUoM)? Note: There are 2 correct answers to this question.

  • A. Fixed bin
  • B. Stringent FIFO
  • C. Large/small quantities
  • D. Partial quantities first

Answer: C,D

 

NEW QUESTION 34
Which of the following can you include in a storage type search sequence for stock removal? Note:
There are 2 correct answers to this question.

  • A. A list of storage type groups
  • B. A list of storage bin types
  • C. A list of storage sections
  • D. A list of storage types

Answer: B,C

 

NEW QUESTION 35
Which of the following are storage type roles? Note: There are 3 correct answers to this question.

  • A. Conveyor System
  • B. Identification Point
  • C. Deconsolidation
  • D. Work Center in Staging Area Group
  • E. Production Supply

Answer: B,D,E

 

NEW QUESTION 36
Which of the following actions are possible based on a value-added service (VAS) order? Note: There are 3 correct answers to this question.

  • A. Capture time required.
  • B. Consume auxiliary products.
  • C. Capture costs.
  • D. Perform quality inspection
  • E. Assemble a kit.

Answer: A,B,E

 

NEW QUESTION 37
......

Truly Beneficial For Your SAP Exam: https://www.examprepaway.com/SAP/braindumps.C_S4EWM_2020.ete.file.html

Download SAP C_S4EWM_2020 Sample Questions: https://drive.google.com/open?id=1TtG3TiSB3o45pZUwW-66z4rPen0ajthn