SAP C_TSCM42_67 Exam Dumps [2021] Practice Valid Exam Dumps Question [Q29-Q53]

Share

SAP C_TSCM42_67 Exam Dumps [2021] Practice Valid Exam Dumps Question

C_TSCM42_67 Dumps - Grab Out For [NEW-2021] SAP Exam


SAP C_TSCM42_67 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Lean Manufacturing (PP-REM, PP-KAB) 8% - 12%

Outline the highlights of repetitive manufacturing and kanban.

Material and Capacity Requirements Planning > 12%

Characterize production-relevant planning functionality.

Material Requirements Planning (PP-MRP) > 12%

Explore material requirements planning functions.

Master Data (LDM) 8% - 12%

Set up master data for production planning and manufacturing.

Production Orders Basics (PP-SFC) 8% - 12%

Apply production order functionality.


 

NEW QUESTION 29
Which of the following statements about the planning functions available in SAP ECC is correct?

  • A. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
  • B. Long-term planning (LTP) is a long-term form of forecast planning.
  • C. Material requirements planning (MRP) includes automatic capacity leveling.
  • D. Master production scheduling (MPS) refers to preferred planning of important materials.

Answer: D

 

NEW QUESTION 30
Which of the following properties about the planning functions available in SAP ECC applies?

  • A. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
  • B. Material requirements planning (MRP) includes automatic capacity leveling.
  • C. Long-term planning (LTP) is a long-term form of forecasting.
  • D. Master production scheduling (MPS) refers to preferred planning of important materials.

Answer: D

 

NEW QUESTION 31
During the processing of production orders planned and actual costs are determined.
On which of the following objects can you collect these costs? (Choose two)

  • A. Planned order
  • B. Product cost collector
  • C. Production order
  • D. Work center

Answer: B,C

 

NEW QUESTION 32
What do you have to consider, when you use the ATP (Available To Promise) checks for material? (Choose two)

  • A. ATP checks can be adjusted to also consider future requirements and receipts.
  • B. ATP checks can be carried out automatically when releasing a production order.
  • C. ATP checks are automatically performed during Material Requirements Planning (MRP) runs.
  • D. ATP checks are used to evaluate the free capacity on a certain work center.
  • E. ATP checks are mandatory for lead-time scheduling.

Answer: A,B

 

NEW QUESTION 33
You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC.
On which specifications is the dynamic safety stock calculation based?

  • A. The static safety stock per day and the safety time
  • B. The static safety stock and the material forecast
  • C. The average daily demand and the desired range of coverage
  • D. The average daily demand and the safety time

Answer: C

 

NEW QUESTION 34
Which of the following statements about the SAP Solution Manager listed is correct?

  • A. Solution Manager is an add-on industry solution.
  • B. Solution Manager is a stand-alone system that communicates with other systems in a system landscape.
  • C. Solution Manager is a satellite system in a system landscape.
  • D. Solution Manager is part of the SAP ECC System.

Answer: B

 

NEW QUESTION 35
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?

  • A. Requirements planning creates an appropriate exception message in basic dates scheduling.
  • B. Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling.
  • C. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
  • D. Lead time scheduling cannot take place.

Answer: B

 

NEW QUESTION 36
Which activity can trigger an automatic availability check for the components of a production order?

  • A. Order rescheduling
  • B. Goods receipt for a missing part
  • C. Material staging
  • D. Order release

Answer: D

 

NEW QUESTION 37
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.)

  • A. Work Center
  • B. Material Master (Component)
  • C. Production Scheduling Profile
  • D. Routing
  • E. Material Master (Finished Product)

Answer: A,B,D

 

NEW QUESTION 38
You select the master data for production orders via production versions.
Which information is contained in a production version?

  • A. The control parameters for selecting routings and BOM
  • B. The routing and BOM alternatives to be used
  • C. The default order type to be used
  • D. The explosion dates for the routing and BOM

Answer: B

 

NEW QUESTION 39
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?

  • A. Assign an appropriate availability checking rule to the material master for the product.
  • B. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked.
  • C. Activate the availability check and assign an overall profile in the production scheduling profile.
  • D. Activate the availability check and assign an overall profile in the checking control of the order type / plant combination.

Answer: D

 

NEW QUESTION 40
Which of the following requirements is supported by using process orders?

  • A. Linkage of documents to orders
  • B. Use of production/resource tools
  • C. Use of reference operation sets
  • D. Documentation of the production using an electronic batch record

Answer: D

 

NEW QUESTION 41
What are characteristics of repetitive manufacturing? (Choose three)

  • A. Continuous material consumption, production flow and output
  • B. Production without using production orders and without status management
  • C. Period-based planning of the quantities to be produced
  • D. Automatic line loading based on capacity limits across all production lines
  • E. Shop fabrication

Answer: A,B,C

 

NEW QUESTION 42
Which of the following master data can be used with process orders? (Choose three)

  • A. Resources
  • B. Production/resource tools
  • C. Master recipes
  • D. Serial numbers
  • E. Production versions

Answer: A,C,E

 

NEW QUESTION 43
Which of the following elements do you have to prepare for costing of a production order to function without errors? (Choose three.)

  • A. Propose a standard text key in work center.
  • B. Enter formulas for costing in the work center.
  • C. Assign a production scheduling profile to the material master (product).
  • D. Use an operation control key with the indicator costing-relevant.
  • E. Assign costing variants to order type.

Answer: B,D,E

 

NEW QUESTION 44
What are the consequences of setting a production order to Technically Complete (TECO)? (Choose three)

  • A. Capacity requirements are set to null.
  • B. The order and its operations receive the system status Locked (LKD).
  • C. Confirmations are no longer possible.
  • D. The order is no longer relevant for material requirements planning.
  • E. Reservations are no longer relevant for material requirements planning.

Answer: A,D,E

 

NEW QUESTION 45
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)

  • A. Posting the goods receipt for the production order
  • B. Rescheduling the operation
  • C. Reducing the order quantity
  • D. Confirming the operation
  • E. Setting the status technically complete (TECO)

Answer: C,D,E

 

NEW QUESTION 46
Which of the following statements about consumption are correct? (Choose two)

  • A. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
  • B. Consumption is restructured with the planning run.
  • C. Consumption takes place on the material level between the planned independent requirements and the planned orders.
  • D. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.

Answer: A,D

 

NEW QUESTION 47
Where can you define the default storage location for the material component of a production order? (Choose three)

  • A. BOM header (product)
  • B. Production version (product)
  • C. Production supply area of a work center
  • D. Routing
  • E. Material master (component)

Answer: B,C,E

 

NEW QUESTION 48
Where can you define the valid receivers for production order costs?

  • A. In the costing variant
  • B. In the valuation variant
  • C. In the settlement profile
  • D. In the production scheduling profile

Answer: C

 

NEW QUESTION 49
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

  • A. Resource selection
  • B. Approved master recipes
  • C. Availability check
  • D. Electronic batch record
  • E. Digital signature

Answer: B,D,E

 

NEW QUESTION 50
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?

  • A. It posts planning results to the database automatically.
  • B. It calculates the delay time which may occur in planning.
  • C. It triggers multilevel bottom-up scheduling.
  • D. It propagates exception messages from a component to the finished product.

Answer: B

 

NEW QUESTION 51
In which of the following objects can you activate back flushing for production orders? (Choose three)

  • A. Work center
  • B. Routing
  • C. Material master (finished product)
  • D. Production scheduling profile
  • E. Material master (component)

Answer: A,B,E

 

NEW QUESTION 52
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)

  • A. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material.
  • B. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
  • C. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
  • D. Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.

Answer: A,B

 

NEW QUESTION 53
......